Client:                          Holcim Concrete

Location:                     Turner River

Project:                        Crushing and Screening plant upgrade

Project Objectives:

  • Install a Barmac Vertical Impact Crusher
  • Install a dedusting screen
  • Install a larger product wash screen
  • Install a new control cab and stand
  • Install new switch rooms and stands
  • Replace aged plant

Maxxal tasks:

  • Develop plant layout concepts to achieve the objectives
  • Design modifications to a second hand screen and support stand
  • Analyse and design modifications for second hand conveyors to upgrade for cyclone location
  • Mechanical, structural and civil engineering design
  • Design and produce certified construction drawings for:
    • Site plan
    • Plant G/As to integrate existing and new plant
    • Screen stand
    • Access platforms and stairs
    • Control cab stand
    • Switch room stands
    • Conveyor modifications
    • Concrete wedge pit
    • Concrete footings
    • Concrete slabs
  • Prepare Specifications and Scopes of Work
  • Carry out tender process and recommendations